Quadron
ARCHIVE
28
September, 2021
0
Pre/Post Repair Analysis
Pre/Post Repair Analysis
28
September, 2021
Reservoir Bathymetry & Silt Assessment
Reservoir Bathymetry & Silt Assessment Planys executed underwater visual inspection of the upstream face and bathymetry…
28
September, 2021
Internal Tunnel/Penstock
Internal Tunnel/Penstock Planys conducted underwater visual inspection of the tail race tunnel (TRT) & surge tank for…
28
September, 2021
Tail Race Tunnel/Channel
Tail Race Tunnel/Channel Planys conducted bathymetry survey at Tail Race channel (TRC) of a large dam…
28
September, 2021
Trashrack Inspection
Trashrack Inspection Planys conducted underwater visual inspection of several sections of a dam in North India…
28
September, 2021
Surge Shaft
Surge Shaft Planys conducted underwater visual inspection of concrete wall of surge shaft for an important…
28
September, 2021
Spillway & Plunge Pool Inspection
Spillway & Plunge Pool Inspection Planys conducted underwater visual inspection of a spillway, cellular wall and…
28
September, 2021
Downstream Stilling Basin Inspection
Downstream Stilling Basin Inspection Planys conducted underwater visual inspection and bathymetry of the stilling basin at…
28
September, 2021
Upstream Wall
Upstream Wall Planys offered underwater inspection services for the upstream face of a 50-year-old large and…
28
September, 2021
Gate Groove Inspection
Gate Groove Inspection Planys conducted visual inspection of emergency gates and gate grooves of a dam…